Indeed, the fill/cut value that is input here is a ratio.
The fill/dig data can be entered through left and right slopes. In terms of fill/dig,
use positive symbol to input the required slope, the software selects an
appropriate slope in the list according to the actual position of the point.
Dig/fill is decided via the estimated height of hinge point. If the height is above
the hinge point, the dig slope is used; otherwise the fill slope is used.
STEPS
DISPLAY
Turn to 2
nd
page of the function key bar.
Choose the side chainage which is to be
staked out the slope.
Press SLOPE to start
Slope Stake Out.
【
Alignment S-O
】
Chain.
:
100.000 m
Offset
:
0.000 m
HtDiff
:
0.000 m
R.HT
:
1.598 m
SLOPE
+CHAIN
-CHAIN
│←