37
Requirements and conditions
Cascade connection
All thermal generators in the Rinnai aiM range are from
modular type, therefore it is possible to create a casccade up
to a maximum of 16 units.
To build a cascade of multiple heat generators is it is
necessary to install the Cascade Module on all boilers.
The OCI Cascade Module must be mounted on the back of
the front panel of each Master boiler, while the connector
must be connected to the corresponding terminal on the PCB
LMS14 (see “Electrical connection” diagram).
By connecting the heat generators in cascade, a specific
menu will be activated from which it is possible to set the
following parameters:
Cascade connection
Description
Parameter Selection
Set
Cascade
management
3510
Strategy
Early ignition
Delayed shutdown
3511
Minimum output power
40%
3512
Maximum output power
90%
3532
Boot lock
120 sec
3533
Slow down on shutdown
2 min
3540
Automatic changeover of
manufacturer succession
150 hours
3541
Automatic limitation of producer
succession
No one
3560
Operating point of the minimum
return
60°C
3562
Influence of the return on users
On
6600
Boiler address
1 to 16
A number is assigned to each heat generator and this
determines the first ignition sequence and which device will
be the Master appliance. In particular, on each device it is
necessary to change the parameter
6600
(boiler address):
this parameter varies from 1 to 16. The boiler to which
the number 1 will be assigned will be defined as Master
appliance, the boilers to which the numbers from 2 to 16 will
be defined as Slave devices.
Once the address has been assigned to each boiler in the
cascade, it is necessary to make the physical connection
with a bipolar cable with a section of at least 0.5 mm2 to be
inserted in theterminal highlighted in the figure.
To make all the boilers communicate with each other, it is It
is necessary to connect the terminals of each one in series
cascade module,according to the diagram shown in the figure:
The rotation of the ignition of the heat generators comes
performed directly by the electronics, after a certain number
of hours of operation of the cascade. When more boilers are
connected to each other in cascade, all messages of error or
diagnostics are shown on the display of the Master boiler.
The probe must be connected to the Master heat generator
placed on the flow manifold and any external probe, in order
to regulate the ignition sequence of the boilers and optimize
the functioning of the system.
Содержание aiM 115
Страница 1: ...Modular boilers User and installation manual Indoor models aiM 65 aiM 115 aiM 85 aiM 150 ...
Страница 17: ...13 Technical data Dimensions FRONT VIEW REAR VIEW TOP VIEW BOTTOM VIEW HEIGHT DEPTH ...
Страница 65: ......
Страница 66: ...Via Liguria 37 41012 Carpi Modena Tel 059 622 9248 e mail info rinnai it rinnai it 200626 ...