Setting
Use
More
information
Purification
start time
The time at which the NoNa
+
may start the purification
process. Enter this for each drain water tank.
Purification
end time
The time at which the NoNa
+
will stop the purification
process. Enter this for each drain water tank.
Purification
period
active
Use this setting to have the NoNa
+
automatically start
and stop the purification process during the time period
set.
The NoNa
+
will only start automatically if there
is a sufficient amount of water in the drain
water tank. This means that the drain water
level must be above the low-water float.
Maximum
purification
duration
The maximum length of time that a drain water tank
will be used (continuously) for purification.
See "Drain
water tank"
on the next
page.
Main pause
time
This sets the length of time during which the
purification process will start not automatically. This
prevents the unit from switching on and off too rapidly
as a result of erratic float movement, for example.
See "Drain
water tank"
on the next
page.
Stack
switching
time
This sets the amount of time that it takes the NoNa
+
to
reverse the positions of the valves in the circuit. During
this time, the pumps shut off for a few seconds.
See
"Switching
stack
polarity" on
the next
page.
To set the purification cycle time and and the minimum purification duration,
complete the following steps:
Navigate the path:
.
Tap the
Purification cycle time
setting. A pop-up menu appears.
Select the desired duration.
Tap the Confirm icon ‘
'.
Tap the
Minimum purification duration
setting. A pop-up menu appears.
Select the desired duration.
Tap the Confirm icon ‘
'.
You have set the purification cycle time and the minimum purification duration.
NoNa
+
57
Содержание NoNa+
Страница 1: ...SV 2 4 15 05 2020 96000023 Installation and User Manual NoNa...
Страница 49: ...Flow rate settings Capacity NoNa 10 NoNa 20 NoNa 40 Expected wastewater flow 10 l min 20 l min 40 l min NoNa 49...
Страница 70: ...Signature Date NoNa 70...
Страница 71: ......
Страница 72: ......