No.
Name
No.
Name
1
Desalination box including stack
11
Wastewater
outlet
2
EC sensor (drain water before the stack)
12
Drain water
inlet
3
EC sensor (drain water after the stack)
13
Active carbon
filter
(optional)
4
Sampling valve before the stack
14
Wastewater
tank
5
Wastewater pump
15
Fresh water
tank
6
Drain water pump
16
Dosing pump
for continuous
(acid)
cleaning
7
Emergency stop / Power switch
17
Dosing pump
for
intermittent
(acid)
cleaning
8
Control cabinet
18
Ring filter, 10
microns
9
Sampling valve after the stack
19
Wastewater
flow sensor
10
Drain water outlet
The number of valves depends on the number of drain
water tanks. In this figure, there are four outlet valves
and that means there are four drain water tanks.
If there is one outlet, a manual valve is used; if there
are multiple outlets, electric valves are used. (The same
applies to the drain water inlet.)
20
Ring filter, 55
microns
(optional)
21
Drain water
flow sensor
The following table provides an overview of the main specifications of the NoNa
+
basic configuration(s):
Component
Specifications
Membranes in CED stack
NoNa
+
10: surface area 400 [cm
2
], 48
cell pairs.
NoNa
+
20: surface area 1000 [cm
2
], 48
cell pairs.
NoNa
+
40: surface area 1000 [cm
2
], 96
cell pairs.
Sodium removal per treatment
At least 20%
NoNa
+
17
Содержание NoNa+
Страница 1: ...SV 2 4 15 05 2020 96000023 Installation and User Manual NoNa...
Страница 49: ...Flow rate settings Capacity NoNa 10 NoNa 20 NoNa 40 Expected wastewater flow 10 l min 20 l min 40 l min NoNa 49...
Страница 70: ...Signature Date NoNa 70...
Страница 71: ......
Страница 72: ......