SECTION 8 MAINTENANCE
8 - 6
8.3 Sensor Module Cleaning
During the course of normal operation, a film of gas vapor may
build up inside the sensor module. The rate at which the film
develops depends on the type and concentration of the vapors
being sampled. As a guide, it is recommended to clean the
sensor module upon returning from field work.
The sensor module is made of four major components, as
shown in Figure 8.2:
Moisture filter and O-ring
Sensor block
Lamp house
Lamp and O-ring
Figure 8.2
Disassembly and Assembly of Sensor
Module of Professional PID Unit
Содержание MiniRAE Plus PGM-76
Страница 2: ...RAE Systems Inc 680 West Maude Ave 1 Tel 408 481 4999 Sunnyvale CA 94086 Fax 408 481 4998...
Страница 14: ......
Страница 18: ...SECTION 1 GENERAL INFORMATION 1 4 This page is intentionally left blank...
Страница 56: ...SECTION 3 OPERATION OF ACCESSORIES 3 16 This page is intentionally left blank...
Страница 104: ...SECTION 5 PROGRAMMING IN SURVEY MODE 5 18 This page is intentionally left blank...