Use and installation manual
Page
35
of
97
(PVI-10.0/12.0-I-OUTD(-S)-400 Rev:1.3)
Select the standard based on the following table:
LEFT
SELECTOR
RIGHT
SELECTOR
GRID STANDARD
COUNTRY
LANGUAGE
0
0
N.A.
N.A.
English
0
1
DIN V VDE V 0126-1-1
GERMANY
German
0
5
Guida per le connessioni alla rete
elettrica di ENEL Distribuzione
ITALY
Italian
0
6
El real decreto RD1663/2000
SPAIN
Spanish
0
7
UK G83/1
UNITED
KINGDOM
English
0
8
UK G59/2
UNITED
KINGDOM
English
0
9
EN50438
IRELAND
English
0
A
AS47773
AUSTRALIA
English
0
B
AS47773**
ISRAEL
English
0
D
DIN V VDE V 0126-1-1*
FRANCE
French
0
E
DIN V VDE V 0126-1-1*
BENELUX
French
0
F
DIN V VDE V 0126-1-1*
GREEK
English
1
0
DIN V VDE V 0126-1-1*
PORTUGAL
English
1
1
DIN V VDE V 0126-1-1*
CORSICA
French
1
6
DIN V VDE V 0126-1-1*
CZECH REP.
Czech
* There are deviations from the standard VDE, according to the local norms in low.
** There are deviations from the standard AS47773, according to the local norms in low.
Once the standard has been chosen, a meter will begin to scan the connection to the
grid for 24 hours. Before 24 hours expire, the selected standard can still be
changed. Once the 24 hours have passed, the Power-One assistance center would
have to send an Authorization Key to unblock the inverter, and allow further
changes. Remaining time can be checked on the information menu
Содержание Aurora PVI-10.0-I-OUTD-400
Страница 46: ...Use and installation manual Page 45 of 97 PVI 10 0 12 0 I OUTD S 400 Rev 1 3 Fig 19 Data Transmission Options ...
Страница 99: ...AURORA Inverter Fotovoltaici MANUALE INSTALLAZIONE E OPERATORE Model number PVI 10 0 12 0 I OUTD S 400 Rev 1 3 ...
Страница 143: ...Manuale d uso e installazione Pagina 45 di 97 PVI 10 0 12 0 I OUTD S 400 Rev 1 3 Fig 19 Data Transmission Options ...
Страница 196: ...AURORA Photovoltaik Wechselrichter INSTALLATIONS UND BEDIENUNGSHANDBUCH Model number PVI 10 0 12 0 I OUTD S 400 Rev 1 3 ...