Use and installation manual
Page
34
of
97
(PVI-10.0/12.0-I-OUTD(-S)-400 Rev:1.3)
Step 1: Remove the front cover of the inverter as shown in section 3.4.2.
Step 2: Pass the alarm or signal cables from the inverter terminal box outside, by
passing them through one of the holes on the bottom of the inverter.
Step 3: Connect the cables by following the serigraphy on the signal connector.
3.4.8
Selection of grid standard
WARNING: Before carrying out any operation, follow the
connection/disconnection procedure detailed in paragraph 3.4.1.
The inverter is provided with two selector switches (Fig. 13) which allow installers
to choose which grid standard they wish to apply. The unit is delivered with the
selector switches set in the ‘0’’0’ position (default setting). To allow AURORA to
operate regularly, installers must select the grid standard in accordance with the
national regulations.
To access the selector switches, remove the front cover as shown in paragraph
3.4.2.
NOTE: The ‘0’’0’ default position does not allow connection to the
power supply grid.
Содержание Aurora PVI-10.0-I-OUTD-400
Страница 46: ...Use and installation manual Page 45 of 97 PVI 10 0 12 0 I OUTD S 400 Rev 1 3 Fig 19 Data Transmission Options ...
Страница 99: ...AURORA Inverter Fotovoltaici MANUALE INSTALLAZIONE E OPERATORE Model number PVI 10 0 12 0 I OUTD S 400 Rev 1 3 ...
Страница 143: ...Manuale d uso e installazione Pagina 45 di 97 PVI 10 0 12 0 I OUTD S 400 Rev 1 3 Fig 19 Data Transmission Options ...
Страница 196: ...AURORA Photovoltaik Wechselrichter INSTALLATIONS UND BEDIENUNGSHANDBUCH Model number PVI 10 0 12 0 I OUTD S 400 Rev 1 3 ...