Use and installation manual
Page
55
of
97
(PVI-10.0/12.0-I-OUTD(-S)-400 Rev:1.3)
If the system is ungrounded (neither of the two poles is connected to the ground),
then the first screen will be as follows
After the first check, the following screens alternate between one another
The grid voltage and frequency values are shown, as well as if these values are
within range or not, until connection happens.
The connection will be signaled by a ‘beep’ from the buzzer and from this point
onwards, the screens will show measurements, following the modes described in
paragraph 5.5.3.
5.5.2
Error messages
After the connection has been established, if the inverter detects incorrect
information in the test cycle, the system will interrupt this cycle, indicating the
error code. Refer to the table in paragraph 5.4 for information on error codes.
To customize the display message, use the programming procedure described in
chapter 5.5.6.13 “Alarm Message”.
Until the error has been solved, the system will continue to show the following
cycle of screens:
Once the error has been rectified, the inverter resets all of the function in progress,
restarting the connection (chapter.5.5.1 Connection of the system to the grid)
S/N ………..……..
Firmware……
In range
Custom msg………
Type OUTD
Part No………
In range
ERROR
Code ……..
Connection
………….
Fgrid
50.17 Hz
OK
Vgrid
223.8 V
OK
Next grid check:
30
secs
Содержание Aurora PVI-10.0-I-OUTD-400
Страница 46: ...Use and installation manual Page 45 of 97 PVI 10 0 12 0 I OUTD S 400 Rev 1 3 Fig 19 Data Transmission Options ...
Страница 99: ...AURORA Inverter Fotovoltaici MANUALE INSTALLAZIONE E OPERATORE Model number PVI 10 0 12 0 I OUTD S 400 Rev 1 3 ...
Страница 143: ...Manuale d uso e installazione Pagina 45 di 97 PVI 10 0 12 0 I OUTD S 400 Rev 1 3 Fig 19 Data Transmission Options ...
Страница 196: ...AURORA Photovoltaik Wechselrichter INSTALLATIONS UND BEDIENUNGSHANDBUCH Model number PVI 10 0 12 0 I OUTD S 400 Rev 1 3 ...