Assembly Plan
Surfacing
Material
2'' Below
Grade
2'' Above
Grade
SLIDE
STAKE
(2)
1-1/4'' screws
[PF 3583]
2'' x 4'' x 17-1/4''
Slide Install.
1.
Install Slide centered in the provided opening as shown in
(Fig. 30)
.
2.
Prepare a level area of ground where the bottom of the slide rests 2" below grade
(Fig. 30a)
.
3.
Mark where the slide’s bottom meets the ground and drive a 2" x 4" x 17-1/4" stake until its top is 2'' above the
grade prepared in Step 3. For reference, see
(Fig. 30a)
.
4.
Attach Slide to Stake using (2) 1-1/4'' screws as shown in
(Fig. 30)
.
Fig. 30
Fig. 30a
(4)
1'' Truss
screws
1'' Truss screw
SLIDE INSTALLATION FOR PB 9230
FOR PB 9230
SLIDE SOLD SEPARATELY