Step 2.
Once correct rotation of the auxiliary pump has been obtained (if fitted), press the booster pump jog
button, check to see if the booster pump spins in the correct direction, if it does proceed to step three, if
the booster pump does not spin in the correction direction shutdown main incoming power to the unit
and switch the main power disconnect on the control panel to the ‘Off’ position, using a screw driver
release the lock on the main control panel door and open the panel door. Locate the main incoming
power disconnect switch DS-100. Loosen the screw clamps holding the incoming power L2 and L3 wires
into the disconnect switch input terminals, swap the wires over and re-secure them into the disconnect
switch input terminals, close and lock the enclosure door. Switch main incoming power back on and
rotate the main disconnect switch back to the ‘On’ position. Navigate back to the commissioning screens
and finally to the motor jog screen, jog the booster pump once again to ensure correct rotation.
Step 3.
As correct rotation of both booster and High pressure pump are checked and confirmed during the FAT
test there is no need to check rotation of the High pressure pump. However, it is still recommended as a
final check that you still do so. Press the High Pressure pump jog button and confirm correct rotation of
the pump.
Once these tests have been completed and correct rotation of all connected pumps has been confirmed
exit commissioning mode by pressing the arrow in the top left corner four times. This will return you to
the main operations menu.
Extremely High Incoming Voltage Present!
Always ensure incoming power to the unit has been disconnected and locked off
before proceeding with altering incoming power connections. Failure to do so
could result in injury or death.
Extremely High Outgoing Voltage Present!
Always ensure incoming power to the unit has been disconnected and locked off
before proceeding with altering outgoing power connections. Failure to do so
could result in injury or death.
Coral Sea Owner's Manual
Содержание Coral Sea
Страница 3: ...SECTION 1 SYSTEM DESCRIPTION Coral Sea Owner s Manual...
Страница 14: ...SECTION 2 PRE INSTALLATION NOTES Coral Sea Owner s Manual...
Страница 25: ...SECTION 3 ELECTRICAL INFORMATION Coral Sea Owner s Manual...
Страница 28: ...SECTION 4 INSTALLATION REQUIREMENTS Coral Sea Owner s Manual...
Страница 34: ...Coral Sea Vertical 6800 Page 4 6 Installation This page is intentionally left blank Coral Sea Owner s Manual...
Страница 35: ...SECTION 5 OPERATIONS MANUAL Coral Sea Owner s Manual...
Страница 36: ...Operation THIS PAGE INTENTIONALLY LEFT BLANK Coral Sea Owner s Manual...
Страница 166: ...Intentionally Left Blank Coral Sea Owner s Manual...
Страница 167: ...SECTION 6 R O MEMBRANE INSTALL CARE Coral Sea Owner s Manual...
Страница 168: ...Coral Sea Vertical 6800 Page 6 ii R O MEMBRANE Page Intentionally Left Blank Coral Sea Owner s Manual...
Страница 193: ...SECTION 7 MAINTENANCE AND REPAIR Coral Sea Owner s Manual...
Страница 194: ...Maintenance Coral Sea Owner s Manual...
Страница 203: ...SECTION 8 COMPONENT USER MANUALS Coral Sea Owner s Manual...
Страница 204: ...Page Intentionally Left Blank Coral Sea Owner s Manual...
Страница 215: ...SECTION 9 DRAWING PULL OUTS Coral Sea Owner s Manual...
Страница 216: ...Page Left Intentionally Blank Coral Sea Owner s Manual...
Страница 247: ...SECTION 10 SPARE PARTS LIST Coral Sea Owner s Manual...