39
y
a
l
p
s
i
D
/
s
n
o
it
p
O
g
n
it
t
e
S
g
n
it
t
e
S
tl
u
a
f
e
D
u
n
e
M
Installer setup Service setup
7.3
Dry concrete
To dry the concrete (floor,
walls, etc.) during construction.
Do not use this menu for any
other purposes and in period
other than during
construction.
Edit to set the temperature of dry concrete.
ON / Edit
Edit
Stages: 1
Temperature: 25 °C
Heating temperature for
drying the concrete.
Select the desired
stages: 1 ~ 10,
range: 1 ~ 99
ON
Confirm the setting temperatures of dry
concrete for each stage.
7.4
Service contact
To set up to 2 contact names
and numbers for the User.
Service engineer’s name and contact number.
Contact 1 / Contact 2
Contact 1 / Contact 2
Contact name or number.
Name / phone icon
Input name and number.
Contact name: alphabet a ~ z.
Contact number: 1 ~ 9