31
Installation Manual
battery system, the stand-alone breaker and DC protector must be
The Lithium-ion storage battery system is classified as an electrical instrument. Please wire it safely following the
5-2. Electrical Connection of System
applicable laws and regulations.
● Do not allow water to enter the inside of the main body. Please pay special attention while it is raining or snowing.
● Do not perform work when the scaffolding and/or your hands are wet.
● Always wear insulating gloves and insulated shoes while performing wiring work.
● Protection device for the Lithium-ion storage
set to OFF until the wiring is completed.
● Check that there is no voltage at all of the terminals.
● Ensure that the PE line is securely connected to the ground.
● Do not damage the covered sections of the wiring.
● Prevent the introduction of foreign objects such as scrap wires.
● Use the soecified types and sizes of wires in accordance with local wiring regulations for the wiring.
● Do not mistake the wiring systems and the polarities.
● Process the wires as specified for secure connections.
● Discharge static electricity before working with wires.
● Be sure to tighten the cable gland securely. Do not over tighten it.
● The work must be performed by qualified personnel.
● The outer diameter of the cables which pass through the cable glands must be within the range of a suitable size.
● Plug up the hole for the COM cable gland when the Network Adaptor is not connected.
● Do not use CT other than the designated CT.
● The end of
● Punched parts of the knockout will be repaired with deburring and rust paint.
● Rubber seal of the cable gland that does not pass through the wiring is not taken off.
conduit pipe for outside wiring installation should be put to near the joint of cable gland, then to seal
with using putty.
Содержание LJ-NA02
Страница 6: ...Installation Manual Installation ...
Страница 49: ...Installation Manual Setup ...
Страница 100: ...Installation Manual ...