37
Installation Manual
2) Completely remove foreign objects such as scrap wires.
adjust them. Then retighten the seal nuts with the appropriate torque.
There are no foreign objects such as scrap wires.
The wires have been processed as specified and are connected securely.
■
Operations after Connection
1) Secure the cable to the fixing hardware with an insulating lock.
If any excess lengths of the cables are getting in the way, open the cable gland seal nuts on the base side and
* Attach the cover and front lid if there is some length of time before the test run after the wiring work has been completed.
(Front Lid installation method See 4-2
䐢㻌
2)
●
Connection Check
The interior of the main body is not wet.
The power is turned OFF.
Deburr to the end face of the knockout, it is repaired with rust-proof.
The PE wire is connected and grounded securely.
The cable wires are not damaged.
The cable wire types and sizes are correct.
There are no mistakes in the wiring.
The cable gland seal nuts are tightened securely.
Rubber seal and knockout of the cable gland that does not pass through the wirring has not been removed.
Cable fixing hardware
Cable tie
Cable gland
Содержание LJ-NA02
Страница 6: ...Installation Manual Installation ...
Страница 49: ...Installation Manual Setup ...
Страница 100: ...Installation Manual ...