Line Configuration for the cable details.
■
Connecting the GRID-INTERACTIVE/STAND-ALONE Terminal
Check the terminal position, retract the cable, through the specified cable glands, connected to the terminal.
■
Connecting the SYSTEM Terminal
When multiple inverter combination mode is used, signal lines among lines among the Lithium ion storage battery
system should be connected.
Refer to the following diagram.
System 1
1) Terminal layout and polarities
Make sure that the wires and polarities are correct.
● Do not connect the GRID wire with
STAND-ALONE terminal
This symbol indicates a wiring terminal intended
for connection of a PROTECTIVE EARTHING
CONDUCTOR.
2) Cable types and sizes
PVC Circular Cable 2C+E 2.5 mm
2
* Please use copper wire cables.
* See 1-1.Power and Communication
3) Stripping of wire
Please strip as conductor's stripped length related as drawing.
12 to 13mm
splayed
twisted
bent
4) Connecting
(1) Pull up an operating lever.
(2) Insert a wire into a wire
hole all the way.
(3) Hold the wire and pull down
the operating lever.
(4) Pull the wire slightly to
check if connecting has
been done completely.
(Don't pull strongly.)
SYS
System 2
SYS