29
Installation Manual
The Lithium-ion storage battery system is a rechargeable product and is therefore classified as an electrical instrument.
Be extremely careful and wire it safely.
by qualified personnel.
5. Electrical Connection of System and Battery
5-1. Electrical Connection of Battery
● Do not allow water to enter the inside of the main body. Please pay special attention while it is raining or snowing.
● Do not perform work when the scaffolding and/or your hands are wet.
● Do not touch or short-circuit the POWER electrodes.
● Always wear insulating gloves and insulated shoes while doing wiring.
If the battery electrolytes are leaking, do not touch the liquid with your bare hands.
● Discharge static electricity before working with the wires.
● The work must be performed
● Check that the battery connector is plugged in securely.
● Make sure that the battery is wired correctly.
● Check that the DC protector is OFF before wiring the batteries.
● Do not remove the connector cover until the wiring is started.
①
Battery Wiring
1) DC protector OFF check
Make sure that the DC protector is OFF before connecting the battery connector.
DC Protector
Handle
OFF
(DC protector)
Содержание LJ-NA02
Страница 6: ...Installation Manual Installation ...
Страница 49: ...Installation Manual Setup ...
Страница 100: ...Installation Manual ...