Installing the Remote Terminal Equipment
31
Connect the Bypass Pair
1
Route the bypass pair through the strain relief on the bottom of the enclosure.
2
Terminate the bypass pair on the Quiet Front terminals BYPASS_T and BYPASS_R.
3
Use a cable tie to secure to the bracket near the cable entrance.
Figure 14. Bypass Pair Termination
Do not connect metallic bypass pairs between PG-Flex systems or to other digital loop carrier
(DLC) systems.
Содержание PG-Flex
Страница 10: ...PG Flex System Overview 2 Figure 1 Typical PG Flex Configuration 23 Shelf shown ...
Страница 24: ...PG Flex System Overview 16 ...
Страница 44: ...Installing PG Flex System Hardware 36 Figure 16 Line Unit and Channel Unit Installation Locations ...
Страница 52: ...Installing PG Flex System Hardware 44 Figure 21 Connecting the Metallic Bypass Pair ...
Страница 62: ...Installing PG Flex System Hardware 54 ...
Страница 66: ...Terminal Management 58 Figure 28 Connecting an ASCII Terminal to a Line Unit ...
Страница 104: ...Performance Monitoring 96 ...
Страница 120: ...Troubleshooting 112 ...
Страница 158: ...Screen Menus and Definitions A 36 ...
Страница 162: ...Acronyms and Glossary Glossary 4 ...
Страница 167: ......
Страница 168: ......