Provisioning Your System
64
Before You Begin
The provisioning procedures assume that the PG-Flex system is powered up and connected to an
ASCII terminal (refer to Terminal Management for details). Before you begin, verify the front
panel indications of the units listed below:
Line Unit Front Panel Indications
Verify the following line unit front panel indications:
•
POWER is ON
•
LOOP 1 SYNC is ON
•
LOOP 1 MARGIN is OFF
•
LOOP 2 SYNC is ON
•
LOOP 2 MARGIN is OFF
•
TEST is OFF
•
FAULT is OFF:
FPI-729 List 1 or FAU-728 List 2 Front Panel Indications
Verify the following front panel indications:
•
POWER is ON
•
MAJOR ALARM in OFF
•
MINOR ALARM in OFF
•
BUSY is OFF
•
FAULT is OFF
•
ALARM CUTOFF is OFF
Channel Unit Front Panel Indications
Verify the channel unit (POTS or ISDN) front panel indications:
•
ACTIVE indicators are OFF
•
FAULT is OFF
Before you can provision a PG-Flex system, make sure that HDSL has established
synchronization, no alarms are indicated, and that no calls are in progress.
All RT line unit LEDs, except the SYNC, go off to save power.
If any of the front panel LEDs display a fault, refer to the Troubleshooting section for the
appropriate diagnostic procedures.
Содержание PG-Flex
Страница 10: ...PG Flex System Overview 2 Figure 1 Typical PG Flex Configuration 23 Shelf shown ...
Страница 24: ...PG Flex System Overview 16 ...
Страница 44: ...Installing PG Flex System Hardware 36 Figure 16 Line Unit and Channel Unit Installation Locations ...
Страница 52: ...Installing PG Flex System Hardware 44 Figure 21 Connecting the Metallic Bypass Pair ...
Страница 62: ...Installing PG Flex System Hardware 54 ...
Страница 66: ...Terminal Management 58 Figure 28 Connecting an ASCII Terminal to a Line Unit ...
Страница 104: ...Performance Monitoring 96 ...
Страница 120: ...Troubleshooting 112 ...
Страница 158: ...Screen Menus and Definitions A 36 ...
Страница 162: ...Acronyms and Glossary Glossary 4 ...
Страница 167: ......
Страница 168: ......