Installing the Central Office Terminal Equipment
41
Connect the CO Battery
Connect the CO Battery (Figure 19). The FCS-719 List 4B COT shelf may be powered from a
single battery feed or from a split battery feed where you would connect Battery A (-48V_A) for
Systems 1 and 2, and Battery B (-48V_B) for Systems 3 and 4.
1
For split battery feed:
•
Remove and discard the jumper between TB1 and TB2.
•
Connect the wire used for the CO battery A to TB1 (-48V_A) termination point.
•
Connect the wire used for the CO battery B to TB2 (-48V_B) termination point.
•
Connect the wire for the CO battery return A to TB4 (RTN_A) termination point.
•
Connect the wire for the CO battery return B to TB3 (RTN_B) termination point.
•
Connect the CO battery return wire from TB4 on the COT shelf to the CO battery return
termination point.
•
Connect the CO battery return wire from TB3 on the COT shelf to the CO battery return
termination point.
•
Connect the CO battery wires from TB1 (-48V_A) and TB2 (-48V_B) on the COT shelf to
the equipment bay fuse panel termination points.
2
For single battery feed:
•
Connect the wire used for the CO battery A to TB1 (-48V_A) termination point.
•
Connect the wire for CO battery return A to TB4 (RTN_A) termination point.
•
Connect the CO battery wire from TB1 (-48V_A) on the COT shelf to the equipment bay
fuse panel termination points.
•
Connect the CO battery return wire from TB4 on the COT shelf to the CO battery return
termination point.
Figure 19. Connecting the CO Battery
Содержание PG-Flex
Страница 10: ...PG Flex System Overview 2 Figure 1 Typical PG Flex Configuration 23 Shelf shown ...
Страница 24: ...PG Flex System Overview 16 ...
Страница 44: ...Installing PG Flex System Hardware 36 Figure 16 Line Unit and Channel Unit Installation Locations ...
Страница 52: ...Installing PG Flex System Hardware 44 Figure 21 Connecting the Metallic Bypass Pair ...
Страница 62: ...Installing PG Flex System Hardware 54 ...
Страница 66: ...Terminal Management 58 Figure 28 Connecting an ASCII Terminal to a Line Unit ...
Страница 104: ...Performance Monitoring 96 ...
Страница 120: ...Troubleshooting 112 ...
Страница 158: ...Screen Menus and Definitions A 36 ...
Страница 162: ...Acronyms and Glossary Glossary 4 ...
Страница 167: ......
Страница 168: ......