Installing PG-Flex System Hardware
34
Install the Line Unit
Install the RT line unit and verify operation as follows (see Figure 16 “Line Unit and Channel Unit
Installation Locations” on page 36):
1
Insert the RT line unit into the RT enclosure and verify:
•
all LEDs turn on for about seven seconds, then scan from top to bottom
•
PWR LED remains on
•
after about 30 seconds, SYNC LEDs for Line 1 and Line 2 begin to flash
(both COT and RT)
•
within 35 seconds, SYNC LEDs for Line 1 and Line 2 turn on
2
Verify the following front panel indications after the system powers up and establishes HDSL
synchronized communications, and when no calls are in progress:
•
POWER is on (turns off after about two minutes, but pressing the ACO button will turn it
back on)
•
LOOP 1 SYNC is on
•
LOOP 1 MARGIN is off
•
LOOP 2 SYNC is on
•
LOOP 2 MARGIN is off
•
TEST is off
•
FAULT is off
Do not connect metallic bypass pairs between PG-Flex systems or to other digital loop carrier
(DLC) systems.
Observe normal electrostatic discharge precautions when handling electronic equipment. Do not
hold electronic plugs by their edge. Do not touch components or circuitry.
Содержание PG-Flex
Страница 10: ...PG Flex System Overview 2 Figure 1 Typical PG Flex Configuration 23 Shelf shown ...
Страница 24: ...PG Flex System Overview 16 ...
Страница 44: ...Installing PG Flex System Hardware 36 Figure 16 Line Unit and Channel Unit Installation Locations ...
Страница 52: ...Installing PG Flex System Hardware 44 Figure 21 Connecting the Metallic Bypass Pair ...
Страница 62: ...Installing PG Flex System Hardware 54 ...
Страница 66: ...Terminal Management 58 Figure 28 Connecting an ASCII Terminal to a Line Unit ...
Страница 104: ...Performance Monitoring 96 ...
Страница 120: ...Troubleshooting 112 ...
Страница 158: ...Screen Menus and Definitions A 36 ...
Страница 162: ...Acronyms and Glossary Glossary 4 ...
Страница 167: ......
Страница 168: ......