AFX SERIES® OPERATION MANUAL
SECTION 5: UNPACKING AND INSTALLATION
Entire Contents Copyright
2016 by Pacific Power Source, Inc. (PPS) • All Rights Reserved • No reproduction without written authorization from PPS.
AFX Series Power Source Operation Manual
Page 45 of 274
5.13.3
Three Phase Delta Load Output Connection
Connection of a three phase load requires the mating connector provided in the AFX Series®
shipkit. This six pole connector uses a spring loaded wire attachment system. To unlock a
position, use a small screwdriver or pin to push down in the square hole located directly
above each connection. Once you push in, you will feel to spring unlatch. Now push the
stripped wire end into the connector and pull out the small screwdriver or pin. This will
release the spring locking down the wire. Use a pull test to make sure the wire is clamped
down securely.
Repeat for the three phase wires. For Delta loads, there is no neutral connection.
Содержание 3120AFX
Страница 273: ......