![Omron R6YXG500 Скачать руководство пользователя страница 85](http://html1.mh-extra.com/html/omron/r6yxg500/r6yxg500_installation-manual_742792085.webp)
2
Installa
tion
2-27
9
Pass four ropes through the eyebolts and hang them on the hoist.
Use looped ropes with the same length to allow a good lifting balance.
Passing ropes through the eyebolts
Wall-mount model
Wall-mount inverse model
10
Hold the robot and remove the mounting bolts.
Slightly lift the hoist so that the tension is lightly applied to each rope to hold the robot. In this state, remove the mounting
bolts from the supplied pallet or installation base (if the robot is moved to another installation base).
11
Move the robot.
Using caution to keep the balance of the robot and avoid subjecting it to any strong vibrations and shocks, operate the hoist
carefully to gently move the robot to the installation base.
Moving the robot
Wall-mount model
Wall-mount inverse model
Be careful not to apply any force since the robot is lifted
using the top end of the spline as a fulcrum.
Be careful not to apply any force since the robot is lifted
using a portion around the connector of the robot cable
as a fulcrum.
NOTE
The top end of the spline becomes a fulcrum. So, hold the robot by hand so that the robot’s own weight is not applied to the top end of
the spline. (For the wall-mount inverse model, a portion around the connector of the robot cable becomes a fulcrum.)
Содержание R6YXG500
Страница 1: ...ZX T Series Cat No I155E EN 03A R6Y XG series INSTALLATION MANUAL SCARA Robots XG Series...
Страница 2: ......
Страница 10: ......
Страница 36: ......
Страница 38: ......
Страница 39: ...Contents Before using the robot Be sure to read the following notes i Introduction v Introduction...
Страница 40: ......
Страница 46: ......
Страница 48: ......
Страница 56: ......
Страница 169: ...2 Installation 2 111 Installing the extension shaft Extension shaft 1 Upper nut Bolt 2 6 Go out of the safety enclosure...
Страница 174: ......
Страница 176: ......
Страница 220: ......
Страница 221: ...Chapter 4 Periodic inspection Contents 1 Overview 4 1 2 List of inspection items 4 2...
Страница 222: ......
Страница 226: ......
Страница 227: ...Chapter 5 Harmonic drive replacement period Contents 1 Overview 5 1 2 Replacement period 5 2...
Страница 228: ......
Страница 232: ......
Страница 238: ......
Страница 239: ...Chapter 7 Torque limit designated Z axis pushing action Contents 1 Torque limit designated Z axis pushing action 7 1...
Страница 240: ......
Страница 244: ......
Страница 246: ......
Страница 323: ...8 Specifications 8 77 1 3 Robot inner wiring diagram Robot inner wiring diagram R6YXG500...
Страница 330: ...Cat No I155E EN 03A Note Specifications subject to change without notice Authorized Distributor Printed in Europe...