3
Robot settings
3-9
7
Perform the absolute reset.
The message "Reset AbS oK?" appears on the pb
screen.
MANUAL
>RST.ABS>M1 50%[MG][S0H0J]
Starting origin search
Reset ABS OK?
YES NO
−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−−
Performing the absolute reset of the X-axis
Step 7-8
8
Press the
(Yes) key.
Check that there are no obstacles in the robot
movement range, and then press the
key
(YES).
To cancel the absolute reset, press the
(no)
key.
9
Check the machine reference value.
After the absolute reset has been completed, check
that the machine reference value displayed on the PB
is between 40 and 60 (recommended range). (For
R6YXGL250, R6YXGL350, R6YXGL400,
R6YXGL500 and R6YXGL600, the recommended
ange is between 30 and 70.)
If the machine reference value is outside the
recommended range, then the next absolute reset may
not be properly performed. In this case, make the
necessary adjustments while referring to "2.
Adjusting the origin” in this chapter.
2.3.4 Stroke end method (Z-axis) with YRC controller
WARNING
SERIoUS InJURY mAY oCCUR FRom pHYSICAL ConTACT WITH THE RoboT dURInG opERATIon. nEvER EnTER
WITHIn THE RoboT movEmEnT RAnGE dURInG AbSoLUTE RESET.
The operation procedure using the PB is described below.
NOTE
• To return to the previous operation step, press the
key.
• For details about how to operate the robot controller, see the "omRon Robot Controller User's manual".
1
Turn on the controller.
Check that no one is inside the safety enclosure, and
then turn on the controller.
2
Place a sign indicating the robot is
being adjusted.
Place a sign indicating the robot is being adjusted, to
keep others from operating the controller or operation
panel.
3
Enter the manual mode using the PB
screen.
4
Select "RST.ABS".
Press the
(
+
) key to select
"RST.ABS".
Содержание R6YXG500
Страница 1: ...ZX T Series Cat No I155E EN 03A R6Y XG series INSTALLATION MANUAL SCARA Robots XG Series...
Страница 2: ......
Страница 10: ......
Страница 36: ......
Страница 38: ......
Страница 39: ...Contents Before using the robot Be sure to read the following notes i Introduction v Introduction...
Страница 40: ......
Страница 46: ......
Страница 48: ......
Страница 56: ......
Страница 169: ...2 Installation 2 111 Installing the extension shaft Extension shaft 1 Upper nut Bolt 2 6 Go out of the safety enclosure...
Страница 174: ......
Страница 176: ......
Страница 220: ......
Страница 221: ...Chapter 4 Periodic inspection Contents 1 Overview 4 1 2 List of inspection items 4 2...
Страница 222: ......
Страница 226: ......
Страница 227: ...Chapter 5 Harmonic drive replacement period Contents 1 Overview 5 1 2 Replacement period 5 2...
Страница 228: ......
Страница 232: ......
Страница 238: ......
Страница 239: ...Chapter 7 Torque limit designated Z axis pushing action Contents 1 Torque limit designated Z axis pushing action 7 1...
Страница 240: ......
Страница 244: ......
Страница 246: ......
Страница 323: ...8 Specifications 8 77 1 3 Robot inner wiring diagram Robot inner wiring diagram R6YXG500...
Страница 330: ...Cat No I155E EN 03A Note Specifications subject to change without notice Authorized Distributor Printed in Europe...