2.3.5 Moving the R6YXGS700, R6YXGS800, R6YXGS900 and R6YXGS1000
WARNING
SERIoUS InJURY mAY oCCUR IF THE RoboT FALLS And pInS SomEonE UndER IT.
• CHECK THAT THERE ARE no CRACKS And CoRRoSIon on THE EYEboLT InSTALLATIon. IF FoUnd, do noT USE
EYEboLTS To movE THE RoboT.
• USE A HoIST And RopE WITH CARRYInG CApACITY STRonG EnoUGH To SUppoRT THE RoboT WEIGHT.
• mAKE SURE THE RopE STAYS SECURELY on THE HoIST HooK.
• REmovE ALL LoAdS ATTACHEd To THE RoboT mAnIpULAToR End. IF AnY LoAd IS STILL ATTACHEd, THE
RoboT mAY LoSE bALAnCE WHILE bEInG CARRIEd, And ToppLE ovER CAUSInG ACCIdEnTS.
CAUTION
• When moving the robot by equipment such as cranes that require a license, only properly qualified personnel may operate it.
• The equipment and tools used for moving the robot should be serviced daily.
The following describes how to correctly and safely move the robot using the R6YXGS700 as an example.
Move also the R6YXGS800, R6YXGS900 and R6YXGS1000 in the same manner.
1
Lower the Z-axis from its origin position.
For the R6YXGS700, R6YXGS800, R6YXGS900 and R6YXGS1000, lower the Z-axis approximately 5mm from its origin
position.
NOTE
The Z-axis is secured to the X-arm with the arm clamp stay at shipment from the factory.
2
Turn off the controller.
3
Disconnect the robot cable from the controller.
4
Remove the bolts from the jig clamping holes.
NOTE
Since the jig is installed at shipment from the factory, this work is not needed.
Removing the bolts from the jig clamping holes
Bolts, 4 locations
Содержание R6YXG500
Страница 1: ...ZX T Series Cat No I155E EN 03A R6Y XG series INSTALLATION MANUAL SCARA Robots XG Series...
Страница 2: ......
Страница 10: ......
Страница 36: ......
Страница 38: ......
Страница 39: ...Contents Before using the robot Be sure to read the following notes i Introduction v Introduction...
Страница 40: ......
Страница 46: ......
Страница 48: ......
Страница 56: ......
Страница 169: ...2 Installation 2 111 Installing the extension shaft Extension shaft 1 Upper nut Bolt 2 6 Go out of the safety enclosure...
Страница 174: ......
Страница 176: ......
Страница 220: ......
Страница 221: ...Chapter 4 Periodic inspection Contents 1 Overview 4 1 2 List of inspection items 4 2...
Страница 222: ......
Страница 226: ......
Страница 227: ...Chapter 5 Harmonic drive replacement period Contents 1 Overview 5 1 2 Replacement period 5 2...
Страница 228: ......
Страница 232: ......
Страница 238: ......
Страница 239: ...Chapter 7 Torque limit designated Z axis pushing action Contents 1 Torque limit designated Z axis pushing action 7 1...
Страница 240: ......
Страница 244: ......
Страница 246: ......
Страница 323: ...8 Specifications 8 77 1 3 Robot inner wiring diagram Robot inner wiring diagram R6YXG500...
Страница 330: ...Cat No I155E EN 03A Note Specifications subject to change without notice Authorized Distributor Printed in Europe...