© 2011 Omnicell, Inc.
External Return Bin Installation and Service Guide/
67-2038 Rev D
Index
IN-1
Index
A
access door solenoid, replacing 9
anesthesia workstation
attaching
G3 26
G4 in lower position 60
G4 in upper position 58
cabling
G3 33
G4 in lower position 66
G4 in upper position 61
assembly components 2
C
cabinet preparation 10
cabling
1-2-3-cell
G3 23
G3 with console upgrade 40
G4 55
anesthesia workstation
G3 33
G3 with console upgrade 41
G4 lower position 66
G4 upper position 61
half-cell
G3 20
G3 with console upgrade 40
G4 54
OmniRx
G3 18
G3 with console upgrade 40
G4 54
OmniTT
G3 12
G3 with console upgrade 40
G4 left side 46
G4 right side 51
cam locks, replacing 6
components of ERB 2
configuration
cabling 1
daisy chains 72
ERB hardware 77
software requirements 1
D
daisy chains 72
E
E-box cover
F
FlexLock 72
I
installation
1-2-3-cell
attaching ERB 21
cabling for G3 with console upgrade
anesthesia workstation
attaching ERB in lower position (G4)
attaching ERB in upper position (G4)
attaching ERB to G3 26
cabling for G3 with console upgrade
G3 cabling 33
G4 lower position cabling 66
G4 upper position cabling 61
cabling for G3 with console upgrade
OmniRx