© 2011 Omnicell, Inc.
External Return Bin Installation and Service Guide/
67-2038 Rev D
Installation Instructions
2-41
Installation on G3 Cabinets with G4 Console Upgrade
Cabling for the Anesthesia Workstation G3 with the G4 Upgrade
Attaching the ERB to the AWS G3 with the G4 upgrade is the same as attaching it to the AWS G3,
but the cabling is different. See
“Attaching the ERB to the AWS G3”
ERB. This section describes the cabling.
1. Remove the worksurface.
a. Swivel the monitor out of the way.
Figure 2-107.
Monitor swiveled away from worksurface
#2036 to unlock the worksurface.
c. Tilt the worksurface up, pull it forward, then lift it up and away. Set it aside.
Figure 2-108.
Tilting the worksurface
Figure 2-109.
Pulling the worksurface forward