
Chapter 4 Inspection
53
W7.091.601
ELECTROSURGICAL GENERATOR ESG-400
4.1 Flow chart for inspection work
The following is a flow chart for inspection work. For details on each step, read
the corresponding description.
4.2
Inspection of power
page 54
Inspection of connection between peripheral
equipment and the electrosurgical generator
page 56
4.4
Inspection of touch-screen and push button
page 57
4.5
Inspection of footswitch connection
page 60
4.6
Inspection of alarm system
page 61
4.7
Procedure after inspection
page 61
4.3
Ins
Содержание ESG-400
Страница 2: ......