3.
Place main anchor clamp bars into position per drawing 120.
NOTE: There is more than one size of clamp bar use the 120
drawing to ensure that each clamp bar is placed in the proper
area.
4.
Apply anti-seize to all main anchors
5.
Using the washers and nuts called out on drawing 120, fasten
each nut down on top of the clamp bar and torque to the values
shown in the anchor torque specifications section below.
NOTE: At each gate end, EPDM will need to be installed prior to the end
main clamp bars.
6e. Interpanel Seal Installation
Similar to the abutment seals, the interpanel seals will need to be trimmed
at the base near the clamp area in order to fit next to the bladder.
1.
Locate the interpanel seal; lay the interpanel seal so that the comma
Red line represents silicone
bead to be applied
Bladder will be lifted to
expose this area
Figure 22: Area under clamp bar for silicone to be applied