GATE SYSTEM INSTALLATION PROCEDURE
Printed:
10/23/2019
15-1507
OHI
OBERMEYER Hydro Inc.
12 of
36
4.
Locate the long hose, insert the stainless steel hose insert and small
plastic tube into hose.
5.
Insert a stainless steel hose clamp over the top of each end of the
hose
6.
Press the side with the small plastic tube FULLY onto the brass hose
barb located on the bladder.
7.
Press the side with the stainless steel hose insert FULLY onto the
stainless steel hose barb located on the embedded pipe.
8.
Tighten down both hose clamps.
THREAD SEALANT
THREAD TO
EMBEDDED AIR
LINE (ADAPTERS
WILL BE
NECESSARY)
Figure 5: Description of step 3