background image

WWW.

ZIPPITY

-OUTDOOR.COM

1

ASSEMBLY 

INSTRUCTIONS

ZP19008

WWW.

ZIPPITY

-OUTDOOR.COM

VER. 

071221

ASSEMBLY

  

INSTRUCTIONS

ZP19008

45 MIN

Approximate assembly time for 2 screens

Want to see a video on how to 

assemble this product? 

 

Scan the QR code

WILMINGTON

PRIVACY SCREEN 

2-PACK

(36” W X 45”H)

Содержание WILMINGTON ZP19008

Страница 1: ...UCTIONS ZP19008 WWW ZIPPITY OUTDOOR COM VER 071221 ASSEMBLY INSTRUCTIONS ZP19008 45 MIN Approximate assembly time for 2 screens Want to see a video on how to assemble this product Scan the QR code WILMINGTON PRIVACY SCREEN 2 PACK 36 W X 45 H ...

Страница 2: ...rvice department parts nychbrands com support zippity outdoor com 704 892 5222 877 234 6196 Customer service agents are available to take calls weekdays from 8am 5pm EST If you call outside of business hours please leave a voicemail To help you quickly and accurately please have reference item number ZP19008 and the specific part name which can be found on page 4 It is helpful if you can provide t...

Страница 3: ...WWW ZIPPITY OUTDOOR COM 3 ASSEMBLY INSTRUCTIONS ZP19008 2 5 8 in 33 3 8 in 43 in 45 1 2 in 1 in 36 1 2 in ...

Страница 4: ...Rail End Cap 12 6 installed 6 loose Top and Bottom Rail 4 1 x 1 x 36 Post 4 x 1 x 44 Post Cap 4 Picket 28 x 1 x 40 STEP 1 LAY OUT MATERIALS J K I H A B C D E F G Self Drilling Stainless Steel Screw 24 Bag A 1 Self Drilling Stainless Steel Screw 8 Bag B Post Anchor 4 x 1 x 16 1 8 Steel Drill Bit 1 ...

Страница 5: ...in the top and middle rails Fasten together using 8 self drilling stainless steel screws I Guide 14 pickets C down through the top and middle rails Push down into the top rail until the pickets lock into place Note Top and Bottom Rails only have picket holes on one side Top of screen Align holes B G D E D C STEP 2 1 STEP 2 2 STEP 2 3 STEP 2 4 J Identify the Top and Bottom Rails D and middle rails ...

Страница 6: ...ttom rail with the pre drilled holes in the posts Insert each picket into the bottom rail 10 in 1 Slide the Post Anchors F 6 into the bottom of the post 10 of post anchor should be visible 2 Use the 1 8 Drill Bit K to drill 4 total holes in the post anchor through the pre drilled holes in the bottom rail 3 Drive 4 3 4 self drilling stainless steel screws into the pre drilled holes in the bottom ra...

Страница 7: ...n and identify the location of posts Attempt to push the unit into the ground as illustrated All 10 of the post anchors should be inserted into the ground so that they are no longer visible STEP 4 ASSEMBLE SCREEN FRAME STEP 4 1 STEP 4 2 STEP 3 3 Repeat steps 1 through 3 for your second screen ...

Страница 8: ...ptionally 1 If your ground is too hard loosen the top 6 or 7 of the ground with a claw hammer as illustrated 2 Add water to loosened soil 3 Use a block of wood to protect the top of post and gently hammer the post into the ground STEP 4 3 Block of wood 3 1 2 ...

Страница 9: ...creen as necessary and backfill excavated dirt If your ground is really hard you may need to dig a hole large enough to accommodate one post from each panel into the same hole Approximately 8 in diameter and 10 deep Backfill and compact the dirt STEP 4 4 STEP 4 5 Level ...

Страница 10: ...10 ASSEMBLY INSTRUCTIONS ZP19008 Fasten screens together with joiner clips H using the 1 self drilling stainless steel screws J as illustrated 45 degree application 90 degree application STEP 5 FASTEN JOINER CLIPS STEP 5 1 J H ...

Страница 11: ...WWW ZIPPITY OUTDOOR COM 11 ASSEMBLY INSTRUCTIONS ZP19008 Push the post caps A down over the posts to lock into place STEP 6 FASTEN POST CAPS STEP 6 1 A ...

Страница 12: ...WWW ZIPPITY OUTDOOR COM 12 ASSEMBLY INSTRUCTIONS ZP19008 WWW ZIPPITY OUTDOOR COM 704 892 5222 877 234 6196 support zippity outdoor com 6935 Reames Rd Ste K Charlotte NC 28216 ...

Отзывы: