GATE SYSTEM INSTALLATION PROCEDURE
Printed:
10/23/2019
15-1507
OHI
OBERMEYER Hydro Inc.
18 of
36
c.
Figure 12: Example of hinge flap being tied back to main anchors
Hinge Flap
Must be pulled up to fit gate
Base of gate is to be
inserted into this gap
Hinge studs located on
bottom of gate should go
through hinge holes when
properly positioned
Main anchors should already
be through the bladder main
anchor holes prior to steel
gate installation
Figure 11: Description of hinge flap to be pulled back