GATE SYSTEM INSTALLATION PROCEDURE
Printed:
10/23/2019
15-1507
OHI
OBERMEYER Hydro Inc.
13 of
36
NOTE: Hose will do a full loop between both connections, as
shown on 123. Visually inspect the assembly to make sure no leak
paths or kinks in the hose exist.
Stainless hose barb
Connected to embedded
pipe
Stainless steel hose insert
Fully inserted into hose
Hose Clamp
Tightened after hose is over
both hose bards
Hose
Hose will create a loop in
between both barbs.
Visually inspect no kinks in
hose
Hose Clamp
Tightened after hose is over
both hose bards
Plastic Tube
Fully inserted into hose
Brass Elbow and Hose Barb Assembly
Connected to bladder connection