GATE SYSTEM INSTALLATION PROCEDURE
Printed:
10/23/2019
15-1507
OHI
OBERMEYER Hydro Inc.
24 of
36
Figure 16: Dimension "D"
8.
Cut out the rectangle marked in step 3.
9.
Continue to apply anti-seize to each abutment seal stud up the gate and mark
the position of the stud with a mallet. Pry bars may be utilized to force
abutment seal into correct position. Note that the marking should only be
used for the upstream – downstream position of each stud. The left to
right dimension should be dimension “D” for all holes.
10.
Identify the position of each hole using the upstream – downstream mark and
dimension “D”, and drill each hole accordingly.
Dimension “D”
Figure 17: Description of steps 9 and 10