GATE SYSTEM INSTALLATION PROCEDURE
Printed:
10/23/2019
15-1507
OHI
OBERMEYER Hydro Inc.
26 of
36
anchor bolts. Lay the holes that were made in the EPDM over the
anchors and below the bladder. Lay the bladder back into place.
3.
Pull the free end of the EPDM tight to match the contour of the
clamp and hinge as best as possible. Mark the position that the
EPDM sits over the main anchors, and on the hinge studs and
interpanel seal studs.
4.
Cut the holes so that the EPDM can lay over each of these studs.
Holes cut in figure 19 (step
1) are located here
Holes for hinge studs and
interpanel seal studs will
be cut here
Second holes for main
anchors will be cut here
EPDM represented by
thick green line
Figure 19: Section view of EPDM