Urban Escape Vinyl Fence w/Post
(6’ High x 6’ Wide)
PRODUCT OVERVIEW
This fence can be easily trimmed down in width and
height to accommodate shorter applications.
3 in.
70 in.
72 3/4 in.
69 in.
75 in.
2 in.
72 in.
32 in.
46 in.
All Posts Include One 46 Inch
Long Internal Steel Stiffener
(Pre-Installed)
The portion of the vinyl post that includes
the steel stiffener MUST be installed
into the concrete footing as illustrated.
Leave approximately a1/8 inch gap
between end of board and back of
post groove to allow for thermal
expansion and contraction of boards.
10 in Dia x 36 in Deep Concrete (or below your frost line)
Internal Steel Stiffener
You will need to purchase at least one extra
post to complete your fence project.
3 in.
Discover the Benefits of Zippity Vinyl Fence
•
Made of durable, low-maintenance white vinyl
•
Post design offers architectural character and flexibility when installing fence
•
Post design also offers 4-way universal directional capabilities (you do not need to order end, line, corner or specialized gate posts)
•
Tongue and groove horizontal boards offer symmetrical appearance; same look on both sides of the fence
•
Limited Lifetime Warranty
Please visit
www.zippity-outdoor.com
or call us at
1-877-234-6196
for answers to your other questions.
We are eager to help you succeed in your project. Thanks for choosing Zippity, and all the best with your project.
1
4
How to Accommodate Sloping Ground?
This fence can be installed in a Racking Fashion, or a Stair Step Fashion. See illustrations below.
WARNING!
If your yard has a severe slope or elevation change greater than approximately
7” to 8“ over one panel of fence, you will not be able to install this fence.
Your post will not be long enough to accommodate.
RACKING FASHION
STAIR STEP FASHION
The boards need to be trimmed.
Tips
• Use a fine tooth metal or wood blade for trimming down PVC components.
• For easier spacing of posts, you can optionally use a piece of lumber trimmed down to 69 inches.
Dig the lowest board into the
higher side of elevation.
Use excavated dirt to fill in
lower elevations as necessary.
Dig the lowest board into the
higher side of elevation.
Use excavated dirt to fill in
lower elevations as necessary.
75
Km/H
Wind Rated