Maintenance
7-18
Part 1126187_05
E
2021 Nordson Corporation
Installing the Piezo Actuator
To install the piezo actuator, do the following steps.
1. Obtain a new piezo actuator (6).
2. Use a 2.5 mm hex driver to tighten the two screws (4) that hold the slide
block (5) to the piezo actuator (6). Torque the screws to a value of
8-9 in-lb.
2
3
1
4
4
5
6
Figure 7-16 Piezo Actuator Assembly
3. Use a 2.5 mm hex wrench to tighten the two screws (2) that hold the air
flush heat exchanger (3) to the slide block (5). Torque the screws to a
value of 8-9 in-lb.
4. Slide the the piezo actuator (2) down into the frame plates (1), along with
the slide block (3) and air flush heat exchanger (4).
1
3
2
1
5
4
Figure 7-17 Piezo Actuator Assembly
5. Slide the aluminum block (5), onto the air fitting on the air flush heat
exchanger (4).
6. Place the applicator on a table as shown in Figure 7-18.
Содержание Vulcan Jet
Страница 26: ...Description 2 8 Part 1126187_05 E 2021 Nordson Corporation This page intentionally left blank...
Страница 38: ...Installation 3 12 Part 1126187_05 E 2021 Nordson Corporation This page intentionally left blank...
Страница 110: ...Advanced Controller Configuration 6 36 Part 1126187_05 E 2021 Nordson Corporation This page intentionally left blank...
Страница 121: ...Maintenance 7 5 Part 1126187_05 E 2021 Nordson Corporation 1 2 3 5 4 4 6 7 8 Figure 7 2 General Disassembly...
Страница 162: ...Parts 9 4 Part 1126187_05 E 2021 Nordson Corporation Figure 9 2 Vulcan Jet applicator parts...
Страница 163: ...Parts 9 5 Part 1126187_05 E 2021 Nordson Corporation Figure 9 3 Vulcan Jet applicator parts...
Страница 166: ...Parts 9 8 Part 1126187_05 E 2021 Nordson Corporation 5 1 4 2 20 5 9 8 6 7 6X 19 3 Figure 9 5 Controller Assembly...
Страница 171: ......
Страница 172: ......