Installation
3-4
Part 1126187_05
E
2021
Nordson Corporation
Step 1: Mounting the Bracket and Applicator
1. Unpack the Vulcan Jet controller and all components.
Leave all cables
in their bags.
2. Mounting the bracket and securing the Vulcan Jet Applicator assembly:
S
For supported robots:
Continue to the next step on page 3-5.
‐
ROBOT Unity 2 3 AXIS 200 X 200 X 50 MM
‐
ROBOT Unity 3 3 AXIS 300 X 300 X 100 MM
‐
ROBOT Unity 4 3 AXIS 400 X 400 X 100 MM
‐
ROBOT Unity 5 3 AXIS 500 X 500 X 100 MM
‐
ROBOT Unity 4X 3 AXIS 400 X 400 X 100 MM
‐
ROBOT Unity 4XP 3 AXIS 350 X 400 X 100 MM
S
For unsupported robots
: You can mount the Vulcan Jet applicator
to just about any robot or to a production line. However, you will have
to modify or create your own mounting plate.
Skip the rest of this procedure and proceed to
Step 2, Setting up the
Air Kit and Applicator
on page 3-6.
Содержание Vulcan Jet
Страница 26: ...Description 2 8 Part 1126187_05 E 2021 Nordson Corporation This page intentionally left blank...
Страница 38: ...Installation 3 12 Part 1126187_05 E 2021 Nordson Corporation This page intentionally left blank...
Страница 110: ...Advanced Controller Configuration 6 36 Part 1126187_05 E 2021 Nordson Corporation This page intentionally left blank...
Страница 121: ...Maintenance 7 5 Part 1126187_05 E 2021 Nordson Corporation 1 2 3 5 4 4 6 7 8 Figure 7 2 General Disassembly...
Страница 162: ...Parts 9 4 Part 1126187_05 E 2021 Nordson Corporation Figure 9 2 Vulcan Jet applicator parts...
Страница 163: ...Parts 9 5 Part 1126187_05 E 2021 Nordson Corporation Figure 9 3 Vulcan Jet applicator parts...
Страница 166: ...Parts 9 8 Part 1126187_05 E 2021 Nordson Corporation 5 1 4 2 20 5 9 8 6 7 6X 19 3 Figure 9 5 Controller Assembly...
Страница 171: ......
Страница 172: ......