1
Maintenance
5-18
P/N 7105144G
2008 Nordson Corporation
VersaBlue_NW
Tank Isolation Valve
Installing Service Kit
Each kit contains one O-ring and high-temperature grease.
Service Kit, for P/N refer to separate
Parts List
.
Required tools:
Allan key, size 4
Pliers
Open-jawed wrench, size 13, to operate the tank isolation valve
Size 13
1.
Heat melter to operating temperature.
WARNING:
Hot! Risk of burns. Wear appropriate protective
clothing/equipment.
2.
Empty tank.
3.
Release four Allan screws M5 and lift off plate. Use a pliers to extract the
tank isolation valve from the safety valve plate.
4.
Remove old O-ring and clean tank isolation valve.
5.
Apply high temperature grease to O-ring, then install again with tank
isolation valve.
1
0
0: Closed
Tank side
Pump side
1: Open
NOTE:
Operate the tank isolation valve only when the melter has reached
operating temperature.
Содержание VersaBlue VB Series
Страница 40: ...Introduction 2 14 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Страница 66: ...Installation 3 26 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Страница 150: ...Operation 4 84 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Страница 174: ...Maintenance 5 24 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Страница 236: ...Parts 8 2 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Страница 250: ...Options 10 6 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Страница 254: ...Password A 4 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Страница 280: ...Glossary D 16 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...