- 122 -
www.New-Leader.com
(800) 363-1771
314520-AA-A
Page Rev. A
NEW LEADER • NL5000G5 AGCO
Header
CYLINDER BLEEDING
Bleeding routine is run to purge air from hydraulic cylinders for accurate positioning. Perform the bleeding routine
at the beginning of each season, after any service work has been performed on the hydrauilc system, and upon
startup if spreader has been sitting for an extended period of time.
•
Press
to access cylinder bleed routine.
•
The Tools main screen will appear. Press
to continue.
WARNING
Spinner assembly and feedgate(s)
will move during calibration process.
Keep away from moving parts to
avoid injury.
•
Press
to begin bleed routine.
Controller Operations