
- 126 -
www.New-Leader.com
(800) 363-1771
314520-AA-A
Page Rev. A
NEW LEADER • NL5000G5 AGCO
Header
Controller Operations
CHAIN OILER
NOTE:
This program is used to manually oil the chain, set alarm frequency, and set auto-lube settings.
1.
Power up Display Monitor and activate VT.
•
The Run screen will appear. Press
to
continue.
•
The Tools main screen will appear. Press
to continue.
2.
Set duration:
•
Use keypads to set oil chain duration
(recommended 1 revolution). Lube routine
is not used at this time.