- 38 -
www.New-Leader.com
(800) 363-1771
314520-AA-A
Page Rev. A
NEW LEADER • NL5000G5 AGCO
Header
Insert Installation
MICRO COVER INSTALLATION
Air Supply and Electrical Requirements
Auxiliary Supply Line
Electrical Connections
Dry Air - 85 PSIG (5.86 Bar)
Red = 12 V (+)
Black = Ground (-)
Refer to “MultiBin Lid Pneumatics” in the spreader parts manual for air line connections.
Make sure all hardware on insert is torqued before installing cover.
WARNING
Pressurized air may cause sudden movement of parts. Do not service cover components
until safety precautions have been performed.
•
Take preventative measures to prevent falling or runaway of cylinder or mechanism
before maintenance and restart of spreader.
•
Exhaust all residual air and cut the pressure supply for components before servicing.
•
Injury can occur if precautions are not taken.
WARNING
Open cover lid with air prior to removing actuator pin and block cover lid to prevent
closing. Unintentional closing could cause injury.
Fasten a three-point lifting device to two lift hooks and one hole in guide mount as shown in Figure 20. Hoist cover
onto
MultiBin as shown in Figure 21. Align slots and attach hardware. Tighten to recommended torque. Secure
fittings and airline tubing on MultiBin with wire ties as shown in Figure 22. Connect to air and electrical systems.
Open lid and install additional hardware inside cover. Install screens.
Refer to “Air Schematic” page in the
Troubleshooting
section for air supply requirements.
Lift Hooks
Guide Mount
Holes
Figure 20 - Lift Hooks & Guide Mount