CHAPTER 6
NDA-24299
Page 152
Revision 1.0
POST INSTALLATION TEST
FCCS Network Connection Test
3.2.1
ATTCON Call Origination Test
STEP 1:
Dial the operator access code (normally “0”), from STN A in Node A.
STEP 2:
Confirm that the ATT lamp flashes and ringer sounds at each ATTCON in Node B.
STEP 3:
Answer the call by pressing the ATND key.
STEP 4:
Confirm the speech condition is sufficient (no noise, not one-party speech, etc.).
STEP 5:
Release the call by pressing the CANCEL key.
STEP 6:
Replace the handset of STN A in Node A.
3.2.2
ATTCON Call Termination Test
STEP 1:
Press a LOOP key on an ATTCON in Node B.
STEP 2:
Dial the telephone number of STN A.
STEP 3:
Confirm the ringer sounds properly at STN A.
STEP 4:
Answer the call and confirm the speech condition is sufficient (no noise, not one-way speech, etc.).
STEP 5:
The operator at the ATTCON releases the call by pressing the CANCEL key.
STEP 6:
Replace the handset of STN A in Node A.
Figure 6-9 ATTCON Connection Test (origination) via FCCS
3.3 Line (LC, ELC, DLC Card) Connection Test (via FCCS)
Perform the Line (LC, ELC, DLC Card) connection test by following the procedures below and by referring
to
Check
Check
LC
ATI
FCCS
STN A
ATTCON
Node A (Self-Node)
Node B
LSTN: 410000
STN: 2000
LSTN: Logical Station Number STN: Physical Station Number
Operator Access
Code "0"
RING
ING
Содержание NEAX 2400 IPX
Страница 1: ...OCTOBER 2000 NEC America Inc NDA 24299 ISSUE 1 STOCK 200776 Fusion Network System Manual ...
Страница 15: ...LIST OF TABLES NDA 24299 Page x Revision 1 0 This page is for your notes ...
Страница 73: ...CHAPTER 4 NDA 24299 Page 58 Revision 1 0 This page is for your notes ...
Страница 159: ...CHAPTER 5 NDA 24299 Page 144 Revision 1 0 DATA PROGRAMMING Office Data Sheets This page is for your notes ...