NDA-24299
CHAPTER 6
Page 153
Revision 1.0
POST INSTALLATION TEST
FCCS Network Connection Test
3.3.1
Line Origination Test: Confirmation of Physical/Telephone STN Number
STEP 1:
Connect the line circuit card to be tested to a telephone set in Node A (self-Node).
STEP 2:
Lift the handset of STN A and confirm dial tone.
STEP 3:
Place a call to an ATTCON or D
term
in Node B.
STEP 4:
Answer the call and confirm the speech condition and Physical/Telephone (station) number of the
calling station.
STEP 5:
Release the call.
3.3.2
Line Termination Test: Confirmation of Telephone STN Number
STEP 1:
Place a call from ATTCON/D
term
in Node B using the telephone number of STN A.
STEP 2:
Answer the call.
STEP 3:
Confirm the number dialed and that the telephone number of STN A are the same on the display of
the ATTCON/D
term
.
STEP 4:
Release the call.
3.3.3
Line Connection Test: Case of Hot Line/House Phone Involved
STEP 1:
The Station to be tested goes off-hook and confirms ringback tone.
STEP 2:
Check whether the call is routed to the predetermined station/ATTCON.
STEP 3:
Answer the calls and confirm the speech condition.
STEP 4:
Release the call.
Figure 6-10 Line Connection Test (origination) via FCCS
3.4 3-party Conference Trunk Function Test (via FCCS)
Perform the 3-party conference trunk function test by following the procedures below and by referring to
Check
Check
Check
LC /
ELC
ATI
ELC
FCCS
ATTCON
STN A
Node A (Self-Node)
Node B
D
term
ine to be tested
(XXXX)
Содержание NEAX 2400 IPX
Страница 1: ...OCTOBER 2000 NEC America Inc NDA 24299 ISSUE 1 STOCK 200776 Fusion Network System Manual ...
Страница 15: ...LIST OF TABLES NDA 24299 Page x Revision 1 0 This page is for your notes ...
Страница 73: ...CHAPTER 4 NDA 24299 Page 58 Revision 1 0 This page is for your notes ...
Страница 159: ...CHAPTER 5 NDA 24299 Page 144 Revision 1 0 DATA PROGRAMMING Office Data Sheets This page is for your notes ...