NDA-24299
CHAPTER 4
Page 31
Revision 1.0
CHAPTER 4
INSTALLATION
This chapter covers the installation of the Fusion system. The following topics are covered:
•
How to set switches on the following circuit cards:
PA-M96 (HUB)
PA-FCHA (FCH)
PA-24DTR (DTI)
•
How to mount the circuit cards
•
How to run the 10 BASE-T cables
1. Anti-Static Caution
This manual provides Static Caution indicators when describing work involving static-sensitive components.
When performing work accompanied by this mark, be sure to use the anti-static kit.
shows the Static
Caution indicator.
Figure 4-1 Static Caution Indicator
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
Содержание NEAX 2400 IPX
Страница 1: ...OCTOBER 2000 NEC America Inc NDA 24299 ISSUE 1 STOCK 200776 Fusion Network System Manual ...
Страница 15: ...LIST OF TABLES NDA 24299 Page x Revision 1 0 This page is for your notes ...
Страница 73: ...CHAPTER 4 NDA 24299 Page 58 Revision 1 0 This page is for your notes ...
Страница 159: ...CHAPTER 5 NDA 24299 Page 144 Revision 1 0 DATA PROGRAMMING Office Data Sheets This page is for your notes ...