CHAPTER 6
NDA-24299
Page 154
Revision 1.0
POST INSTALLATION TEST
FCCS Network Connection Test
STEP 1:
Using the MBTK Command, make busy all 3-party Conference Trunk (CFTs) except the trunk to be
tested.
STEP 2:
Establish a station-to-station connection between STNs A and B in self-node (Node A).
STEP 3:
STN A goes to Switch Hook Flash (SHF), and after hearing special dial tone, dials the telephone
number of STN C in other node (Node B).
STEP 4:
STN C answers the call.
STEP 5:
STN A, after a brief talk with STN C, makes a SHF, and confirms that a three-way connection has
been set up.
STEP 6:
Release the call.
STEP 7:
Repeat the above steps for all CFTs.
STEP 8:
Using the MBTK command, cancel the make-busy status of the trunk.
Figure 6-11 3-party Conference Trunk Function Test via FCCS
Note:
When a station activates this feature, CFT in Self-Node is used. In this case, CFT in Node A is used.
3.5 FCCS Alternate Routing Test
This section explains how to perform the test for Fusion-link alternate routing. Following the procedures
below and referring to
, make sure that the connection and alternate routing to all FCCS lines
are normal and correctly established.
3.5.1
Primary Route Trunk Test
STEP 1:
Using the MBCT command, make busy all trunks in the primary route except the trunk to be tested.
Check
LC
LC
FCCS
STN A
TELN: 410000
STN: 2000
LC
STN B
TELN: 410001
STN: 2001
STN C
TELN: 420000
STN: 2000
Node A (Self-Node)
Node B
RG
RBT,
SPDT
C
F
T
TSW / MUX Card
SHF
+
TELN: 420000
Check
Содержание NEAX 2400 IPX
Страница 1: ...OCTOBER 2000 NEC America Inc NDA 24299 ISSUE 1 STOCK 200776 Fusion Network System Manual ...
Страница 15: ...LIST OF TABLES NDA 24299 Page x Revision 1 0 This page is for your notes ...
Страница 73: ...CHAPTER 4 NDA 24299 Page 58 Revision 1 0 This page is for your notes ...
Страница 159: ...CHAPTER 5 NDA 24299 Page 144 Revision 1 0 DATA PROGRAMMING Office Data Sheets This page is for your notes ...