POST INSTALLATION TEST
FCCS Network Connection Test
Figure 6-7 Fusion Link-Test Results
STEP 4:
Return Mode to 8 (standard setting) when the test is complete.
STEP 5:
Initialize the FCH (PA-FCHA) card using the MB switch.
Note:
Be sure to initialize the FCH (PA-FCHA) card after changing the setting of the Mode Switch.
3. FCCS Network Connection Test
This section explains how to perform the following connection tests within the Fusion network:
•
Station-to-Station Connection Test (via FCCS)
•
ATTCON Connection Test (via FCCS)
•
Line (LC, ELC, DLC card) Connection Test (via FCCS)
•
3-party Conference Trunk Function Test (via FCCS)
3.1 Station-to-Station Connection Test (via FCCS)
Perform the station-to-station connection test by following the procedures below and by referring to
3.1.1
FCCS Call Origination Test
STEP 1:
Using the MBCT command, make busy all trunks in the route except the trunk to be tested.
STEP 2:
Lift the handset of STN A in Node A.
Note:
When the FCH is a “Root Bridge”, the LOAD LED remains ON.
8
M o d e
LYR
LB
LOAD
EST3
EST2
EST1
EST0
Remains ON
when available
for Ethernet
Remains ON
when ready to broadcast
data packets
Link is
established
Receive
Receive Polarity of
pair-wire is normal
Send
Flash
Front View
Make sure that the LYR LED flashes at 60-INT.
D T I
F C H
M N T
F ro n t V ie w
FCH (PA-FCHA) card
When the result of test
is OK, the LYR LED
flashes.
MB
Check
Содержание NEAX 2400 IPX
Страница 1: ...OCTOBER 2000 NEC America Inc NDA 24299 ISSUE 1 STOCK 200776 Fusion Network System Manual ...
Страница 15: ...LIST OF TABLES NDA 24299 Page x Revision 1 0 This page is for your notes ...
Страница 73: ...CHAPTER 4 NDA 24299 Page 58 Revision 1 0 This page is for your notes ...
Страница 159: ...CHAPTER 5 NDA 24299 Page 144 Revision 1 0 DATA PROGRAMMING Office Data Sheets This page is for your notes ...