CHAPTER 6
NDA-24299
Page 156
Revision 1.0
POST INSTALLATION TEST
Fusion and Non-Fusion Connection Tests
STEP 2:
Station A in self-node (Node A) dials the Physical Station Number for Station B in Node C.
STEP 3:
The call terminates to Station B via FCCS and non-FCCS.
STEP 4:
Confirm the speech condition is sufficient (no noise, not one-way speech, etc.).
STEP 5:
Replace the handset of STN A.
STEP 6:
Repeat the above steps for all Fusion links.
4.2 When Seizing a Trunk from an ATTCON
STEP 1:
The operator at the ATTCON in self-node (Node A) dials Physical Station Number for Station B in
Node C.
STEP 2:
The call terminates to Station B via FCCS and non-FCCS.
STEP 3:
Confirm the speech condition is sufficient (no noise, not one-way speech, etc.)
STEP 4:
The operator at the ATTCON releases the call by pressing the CANCEL key.
Figure 6-13 CCIS-FCCS Outgoing Call Test
Check
L C
LC
S T N B
T E LN : 42 00 00
S T N : 200 0
S T N A
T E LN : 4 100 00
S T N : 20 00
A TT C O N
N od e A (S e lf-N od e )
N o d e C
N od e B
A T I
F C C S
N o n-F C C S
Содержание NEAX 2400 IPX
Страница 1: ...OCTOBER 2000 NEC America Inc NDA 24299 ISSUE 1 STOCK 200776 Fusion Network System Manual ...
Страница 15: ...LIST OF TABLES NDA 24299 Page x Revision 1 0 This page is for your notes ...
Страница 73: ...CHAPTER 4 NDA 24299 Page 58 Revision 1 0 This page is for your notes ...
Страница 159: ...CHAPTER 5 NDA 24299 Page 144 Revision 1 0 DATA PROGRAMMING Office Data Sheets This page is for your notes ...