NDA-24299
CHAPTER 4
Page 55
Revision 1.0
INSTALLATION
Connecting Cables
Figure 4-15 Examples of Ethernet Cable Connection-FCH in PIM2 (1-IMG System) (2/2)
A T T E N T IO N
C o n te n ts
Sta tic S en s itive
H a n dlin g
Pre c au tion s R e q u ire d
06
04 05
03
02
01
00
06
04 05
03
02
01
00
CN
CN
CN
CN
CN
CN
U TP C TG 5 ST C A-J
CN
FC
H
HUB
CN
HUB
BA SE U
P IM 1
P IM 2
PIM 3
LPM
CN
CN
FAN U
P IM 0
CN
FCH
CN
U TP CTG 5 ST CA -M
U TP C TG 5 ST C A -K
UTP C TG 5 S T C A-J
TO PU
06
04 05
03
02
01
00
06
04 05
03
02
01
00
CN
CN
CN
CN
HUB
CN
CN
HU
B
BA S EU
PIM 1
P IM 2
PIM 3
U TP C TG 5 ST C A -J
P IM 0
LPM
FA N U
BS C M
B SC M
CN
FC
H
CN
FC
H
CN
CN
UTP C TG 5 S T C A-M
UTP C TG 5 S T C A-J
TO PU
< FC H in P IM 2 (P attern 3)>
<FC H in P IM 2 (P attern 4)>
Note:
When dual LANIs are used in both Slot 00 and 03 of CPR (Pattern 3 or 4), be sure to use at least
two HUB cards: One HUB for internal LANI (in Slot 00) and the other for external LANI (in Slot
03). However, if this is the case, and FCH is also in a dual configuration, the 10 BASE-T “cross”
connection between the HUBs is not required.
Содержание NEAX 2400 IPX
Страница 1: ...OCTOBER 2000 NEC America Inc NDA 24299 ISSUE 1 STOCK 200776 Fusion Network System Manual ...
Страница 15: ...LIST OF TABLES NDA 24299 Page x Revision 1 0 This page is for your notes ...
Страница 73: ...CHAPTER 4 NDA 24299 Page 58 Revision 1 0 This page is for your notes ...
Страница 159: ...CHAPTER 5 NDA 24299 Page 144 Revision 1 0 DATA PROGRAMMING Office Data Sheets This page is for your notes ...