NDA-24299
CHAPTER 3
Page 13
Revision 1.0
SYSTEM CONFIGURATION
Fusion System with FCH
Note:
When a direct connection is added to the existing Fusion system with FCH card between the two nodes, it
is required to execute Make Busy operation (MB Key ON/OFF) on the FCH cards to prevent from packet
loop.
Figure 3-3 Add a Direct Connection to Fusion System with FCH
On other occasions for adding direct connection (connect cross cable between the HUBs) to the Fusion
network consists of multiple nodes, also perform the MB key ON/OFF operation on just a single FCH card
to prevent from packet loop. See
When the system applies dual configuration, MB Key ON/OFF operation is to be executed to an FCH card
on each #A/#B side.
2.2 Redundancy of FUSION Link
FCH (PA-FCHA) card handles a Fusion link, occupying one time slot of a frame by D/I function equipped on
the DTI card. In terms of redundancy, Fusion system (with FCH) can have one of the following configurations.
•
Redundant Configuration (LANI, HUB, FCH, and DTI)
•
Redundant Configuration (HUB, FCH, and DTI)
•
Redundant Configuration (FCH and DTI)
•
Non Redundant Configuration
FCH
CPU
LANI
HUB
CPU
LANI
DTI
DTI
FCH
HUB
DTI
Fusion Link
1.5M
MB key ON/OFF
Node B
Node A
10BASE-T
DTI
Connect the HUBs with a cross cable
DTI : Digital Trunk Interface
FCH : Fusion Call Control Handler
LANI : LAN Interface
Содержание NEAX 2400 IPX
Страница 1: ...OCTOBER 2000 NEC America Inc NDA 24299 ISSUE 1 STOCK 200776 Fusion Network System Manual ...
Страница 15: ...LIST OF TABLES NDA 24299 Page x Revision 1 0 This page is for your notes ...
Страница 73: ...CHAPTER 4 NDA 24299 Page 58 Revision 1 0 This page is for your notes ...
Страница 159: ...CHAPTER 5 NDA 24299 Page 144 Revision 1 0 DATA PROGRAMMING Office Data Sheets This page is for your notes ...