MRU GmbH
SWG 100 User Manual
Page
64
of
141
Or
F1/F3
Or
F1/F3
Or
F1/F3
Example for a measurement cycle configuration
In this chapter an individual measurement cycle should be created with the
features described at the chapters below.
The measurement cycle should have the following sequence:
Following points must be done to configure the individual measurement cycle:
1.
Open the measurement cycle config. menu: Path:
E
XTRA
/
MEASUREMENT CYCLE CONFIG
.
2.
The default measurement cycle will appear. Open the cycle phase detail of
the first zeroing and adjust the phase duration at 25 min.
3.
Leave the cycle phase detail and select the second point. Switch with the
left/right arrow keys
until the measurement SP2 is selected.
4.
Open with the
OK
key the cycle phase detail of the measurement SP2.
Adjust the duration-phase at 15 min. and the suction/response time until
the pure meas. time has the value of 3 min. Use for this operation the
arrow
keys
.
Содержание SWG 100 biogas
Страница 1: ...MRU GmbH SWG 100 User Manual Page 1 of 141...
Страница 2: ...MRU GmbH SWG 100 User Manual Page 2 of 141...
Страница 13: ...MRU GmbH SWG 100 User Manual Page 13 of 141 Picture above Sample gas flow diagram...
Страница 81: ...MRU GmbH SWG 100 User Manual Page 81 of 141 Device info Path EXTRAS DEVICE INFO Structure...
Страница 86: ......
Страница 92: ......
Страница 133: ...MRU GmbH SWG 100 User Manual Page 133 of 141 13 15 Option NDIR bench for 0 3 000ppm CO2 0 CH4...
Страница 134: ...MRU GmbH SWG 100 User Manual Page 134 of 141 13 16 Option Dilution unit for H2S and CO electrochemical sensors...
Страница 140: ...MRU GmbH SWG 100 User Manual Page 140 of 141 14 Declaration of conformity...
Страница 141: ...MRU GmbH SWG 100 User Manual Page 141 of 141 V01 02 EN...