Press the start switch and advance the voltage control one turn clockwise. Increase the current
set point to maximum and then to minimum. The power and current control indicators should
light. Dc current should increase smoothly from minimum to maximum to minimum as
indicated on the meter. Return the current control full counterclockwise. Press the stop switch.
To check over current trip, press the menu key and the item key three times. This places the
power supply in data entry mode to set over current trip. Using the keypad, enter an over current
trip set point at half the rating of the power supply. Once the over current trip setting has been
entered, press the enter key to save the information.
Press the start switch and slowly increase the current set point. Over current trip should operate
at the over current trip set point. The over current trip (OCT) indicator should turn on, the power
and current control indicators should turn off, and the supply should shut down. Press the clear
key. Now set the over current trip set point to maximum which is 110% the full scale rating of
the power supply. Because the over current trip set point was the last keypad command, data can
simply be entered, eliminating the key presses of menu and item. With the maximum over
current trip set point entered, again start the supply and observe that the power supply operates
normally.
If any of these events do not occur, the supply is defective and should not be operated.
Depending on the circumstances, either warranty service or trouble shooting, as described in
Section 7.2, is required.
2.6.2.2 DPA Series Models
With the power supply off, disconnect the load, set voltage and current potentiometer controls
full counterclockwise, and set the over voltage trip and over current trip potentiometer controls
full clockwise. Connect the power supply to a suitable source of ac voltage. (For this test, only
50% of rated ac current is required.) Turn the power switch on and observe the indicator lights
going through the startup routine. After initialization, the following indicator lights should be
on: standby, int ctl, ext ctl, and rotary. This is the default configuration from the factory. It is
recommended that the following brief electrical check be made shortly after unpacking the
supply.
Press the start switch and advance the current control one turn clockwise. The power and
voltage control indicators should light. Increase the voltage set point to maximum and then to
minimum. Dc voltage should increase smoothly from minimum to maximum to minimum as
indicated on the meter. Return the voltage control full counterclockwise. Press the stop switch.
To check over voltage trip, press the trip dis key on the front panel and set the over voltage trip
potentiometer to half the voltage rating of the supply. While the trip dis key is pressed, the
voltmeter and ammeter displays the over voltage trip and over current trip settings.
Press the start switch and slowly increase the voltage set point. Over voltage trip should operate
22
Содержание DP SERIES II
Страница 1: ...OPERATING AND SERVICE MANUAL DP SERIES II DC POWER SUPPLIES...
Страница 2: ......
Страница 3: ...MAGNA POWER ELECTRONICS INC 39 ROYAL ROAD FLEMINGTON NJ 08822 January 6 2010...
Страница 4: ......
Страница 6: ...improper use of the equipment and accessories ii...
Страница 28: ...Figure 1 2 DP Series air cooled 10 kW to 30 kW package drawing with D Version front panel 15...
Страница 29: ...Figure 1 3 DP Series water cooled 10 kW to 30 kW package drawing with D Version front panels 16...
Страница 39: ...Figure 2 3 DPC Series controls and indicators Energizes control circuits without turning on main power 26...
Страница 44: ...Figure 3 2 Set voltage output at memory displayed Figure 3 3 Set current output at memory displayed 31...
Страница 45: ...Figure 3 4 Set over voltage trip at memory displayed Figure 3 5 Set over current trip at memory displayed 32...
Страница 47: ...Figure 3 7 Set remote sense Figure 3 8 Set internal control 34...
Страница 48: ...Figure 3 9 Set external control Figure 3 10 Set rotary input 35...
Страница 49: ...Figure 3 11 Set keypad input Figure 3 12 Set external program input 36...
Страница 50: ...Figure 3 13 Set remote input Figure 3 14 Set external interlock 37...
Страница 53: ...Figure 3 15 Calibration 40...
Страница 56: ...Figure 3 17 Set remote sense Figure 3 18 Set internal control Figure 3 19 Set external control 43...
Страница 57: ...Figure 3 20 Set rotary input Figure 3 21 Set external program input Figure 3 22 Set remote input 44...
Страница 61: ...Figure 3 24 Calibration 48...
Страница 63: ...Figure 3 25 a Local and b remote sensing 50...
Страница 64: ...Figure 3 26 External a resistive b voltage and current programming 51...
Страница 111: ...98...
Страница 113: ...Figure 5 1 Configuration setup Figure 5 2 GPIB communications setup 100...
Страница 118: ...Figure 5 7 Register Panel Figure 5 8 Calibration Panel 105...
Страница 119: ...Figure 5 9 Firmware Panel Figure 5 10 Modulation Panel for Version D models only 106...
Страница 121: ...Figure 6 1 Block diagram 108...
Страница 128: ...source Figure 8 2 Leadless remote sensing Figure 8 3 IV characteristics for a typical photovoltaic array 115...
Страница 139: ...Figure B 1 Information Panel Figure B 2 Configure Panel 126...
Страница 140: ...Figure B 3 Reboot in Progress Panel Figure B 4 Web Control Panel 127...
Страница 145: ...Figure D 1 RS485 a 2 wire and b 4 wire connections 132...